Hyperscalers are hitting a wall as the EPA closes generator loopholes, rapidly slowing down U.S. AI data centers.


  • EPA removes exemptions for generators, forcing hyperscalers to follow strict federal aviation rules
  • Portable turbines used by xAI now require a full permit before being operated
  • AI data centers face delays as network alternatives require federal approvals

The U.S. Environmental Protection Agency introduced a rule that removes exemptions for gas turbine generators, closing a loophole that allowed the rapid deployment of temporary power systems.

This change affects hyperscalers who rely on portable turbines to provide electricity before their sites are fully connected to the grid.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top